問題詳情:
The 2,298-kilometer Beijing-Guangzhou High-speed Railway ___41___ (official) opened to passengers on December 26,2012. It is the world’s longest high-speed rail route. The ___42___ (design)speed of the track is 350 kilometers, though speeds during the initial period of operation will be limited to about 300 km/h. The new route cuts the travel time between Beijing and Guangzhou ____43____almost two thirds, from 22 hours to roughly 8 hours December 1, 2012,not long before the opening of the Beijing-Guangzhou High-speed Railway, the Harbin-Dalian High-speed Railway, ___44___ first high-speed line ever to cross land that lies frozen for almost half a year, began operations, ___45___ allows passengers to appreciate the view off the coast from Dalian in the morning, ___46___ the winter snowscape of frosty Harbin in the afternoon . At present the total ___47___ (long) of high-speed lines in China ___48___(reach) 9,349 km. With four main lines ___49___ (run) east-west and four north-south, the country’s high-speed train network is the world’s largest. China plans to expand ___50___ high-speed railway network to 50,000 km by 2020, to cover almost all large and medium-sized cities.
【回答】
41. officially
42. designed
43. by 44. the
45. which 46. and
47. length 48. has reached
49. running
50. its
知識點:語法填空
題型:未分類