dry ready mixed cement mortar
Testing on dry mixed cement gravel pile in embankment of Xuchang-Luohe Section of Beijing-Zhuhai Expessway
Cement column with mixed cement and soils is one of the method to reinforce groundsill which includes clay and silt,and so on.
If you have damp walls, damp walls can make one to two months of the drying process, and then brush the wall on a layer of mixed cement slurry to avoid water, moisture from the role.
The reinforcement mechanics and applicative conditions of deep mixed cement pile are simply introduced.
The mixed cement has been hoisted up the building.