網站首頁 練習題 成語大全 造句 名詞解釋 經典語錄 名人語錄
當前位置:國文精選館 > 造句 > 

“waterfall”簡單造句,waterfall造句子

欄目: 造句 / 發佈於: / 人氣:10K

The second layer is where the waterfall elements of the project are planned and managed.

In other cases, a client will run all their projects using waterfall, either implicitly or using their own custom methodologies.

There are three scenic spots. In addition, the brochure points out, a total of eighteen waterfalls making it the world's mostly densely "waterfall" populated area.

Hence, the development approach that is followed is not the classic "waterfall" scenario, where requirements gathering is followed by analysis and design, leading to the implementation of the system.

The waterproof material is suitable for the aerial used near the waterfall.

Because the development team operated within a rigid, waterfall process, they could not adopt all aspects of agile development.

On the way of drifting, we will pass by a waterfall; the one who carries the knapsack can put it on the left of your self.

There is a bridge below the waterfall.

This magnificent waterfall stands as an oasis in the heart of the Grand Canyon.

You will ride on the famous tour boat“ Maid of the Mist” to take an up close view of this most majestic waterfall of the world.

waterfall造句

There was also a small waterfall with brightly colored stalactites.

Imagine my surprise when over half of the teams admitted that they followed a fairly straightforward waterfall process!

About three kilometres to the north of the waterfall is Zhedou Cave which penetrates 300 metres into the mountain with many spacious chambers inside and many interesting rock formations such as stalactites and stalagmites, columns and curtains.

Suddenly they came to a waterfall which dropped into an underground lake at the bottom of the cave.

For example, waterfall, incremental, or iterative models can be created with the same overlapping method content.

They were filled with wonder at the new waterfall.

Dow Spout is a terraced, step-like waterfall located on the slopes of Craignaw in southern Scotland.

However, that runs counter to the thinking behind the waterfall approach: Many design teams would view modifying the design after Stage 1 as a failure of their initial design or requirements process.

This contribution extends beyond, for instance, demanding delivery of something testable earlier — or executing a standard battery of tests earlier — than in a traditional, waterfall-driven process.

Tags:造句 waterfall