Standard for quality inspection and assessment of building construction erection works (container)
Standard for quality inspection and assessment of building construction erection works (general machinery equipment)
Based on the erection period arranged between SELLER and BUYER, the SELLER shall delegate his personnel to supervise erection works in accordance with terms of this Contract.
The tentative schedule of temporary traffic arrangement for bridge ML15 segment erection works is now available as shown below*.
All site erection works will be performed by the Buyer under the technical instruction of the Seller.