In the urban water BOT concession contracts the concession term consists two parts: concession term limit and concession term length.
This papaer deals with decision making method on the concession term for traffic BOT projects.
This paper adopted option game method to explore the construction cost of two - stage concession term decision model of infrastructure BOT project and concession term decision.