In this paper, a computing method of the roughness on nonlined tunnels is presented, and the real roughness on the access tunnel of Yangshan three-stage hydro-power station is obtained based upon the original observed data.
This paper introduces a kind of computing method about short time average zero-over rate.
The paper approaches the steady practical calculati on of common stand, and bring forward a computing method of the stands' total stability on air-center combination bar, d ouble limbed pressure bar and triple limbed pressure bar by the steady pressure bar theory.
An engineering computing method for the velocity of explosively-formed-projectile(EFP) based on the law of energy conservation
Overall model and computing method of public PE class teaching quality in colleges;
To solve the problem about multi-map systemic error correction in regional geochemical exploration, a computing method based on the least squares methods is developed.
Heuristic computing method of bidirectional searching routing with multiple restrictions
A granular computing method based on global tunneling function