隨着CTCS - 3級客運專線工程建設的加快,針對單個rbc的控制能力與RBC的設置原則進行研究很有必要。
The Application of 3D Scene Simulation Technology in the CTCS Level 3 Simulation System;
Modeling and Realizing of On-Board Equipment of CTCS-2 Train Operation Control System with UML;
Research on the Automatic Testing Methodology of CTCS-3 Onboard Equipment
Research on CTCS-3 Board-Ground Communication Protocol Conformance Testing Based on TTCN-3
With speeding up the construction of the passenger dedicated line with CTCS-3 train control system, it is necessary to do the research on the RBC control ability and its arrangement principle.
Schema of Point with Large Number Keeping the Continuity of Bending Track Information in CTCS Level 2