Dongjiang Hydro-mechanism factory of Baju Hydropower construction (Group) is specialty corporation manufacturing hydroelectric metallic structure and embedded parts for turbine.
When vibrating with the vibrator beam, it should be avoided to touch forms, rebars and embedded parts.
The designed concrete joints, the embedded parts and the connectors function well and reliably.
While fixing all embedded parts and embedded bolts, high precise level meter is required for measurement of elevation.
Easy to install, no need of embedded parts, expansion bolts are enough for fixing.
The invention discloses a device for preventing high temperature caused by welding metal embedded parts from burning out concrete base layers and a method thereof.
The design of the bulk concrete structure for foundation and control of the cracks as well as embedded parts in construction are focuses in the engineering circle.