This paper gives a method of calculating the optimum support rigidity of the reinforced beam and calculating the corresponding greatest bearing capacity.
As the preheater tower span of large scale NSP cement plant is great and the internal stress of single beam and pole is also great, steel structure and reinforced beam/pole be used widely because of their special performance.