Optimized power allocation plan in amplify-and-forward cooperative diversity
The optimal allocation plan of spare parts is got by the optimal model with the constraints of the cost of spare parts, the objective of the maximal availability of materiel, reliability, maintainability and supportability of the materiel, and the ability of integration logistic support.
And lastly, determined water resources allocation plan under different drought grades, and formulated the water transfer routes and necessary engineering measures in this regard.